Gansar is located in Block PM6 & PM12 which is approximately 190 km from Kerteh and 40 km from Duyong CPP. A new 10” x 40km Full Well Stream (FWS) rigid pipeline from GaDP-A to Duyong CPP.
Our UK based engineering team completed the detailed structural design and verification of stability and settlement before fabrication and production works of all products was completed at our permanent supply base in Batam.
Once completed, crossing supports and concrete mattresses were loaded onto trucks and transported to SCN Yard for loading on to the T1201.
Products were delivered on-time and on-budget and safely mobilised for the offshore installation campaign in March 2024.